Repaving Omar bin abdulaziz street

 

 Akasim concludes the Repaving process of Omar bin abdulaziz street, a 750 meters long

– Replaced asphalt with basalt stone and constructed side lanes of granite

– Installed cosmetic lighting with a height of 8 meters

– Afforested and implemented agricultural basins along the street

– Installed seats

– Equipped a track for the blind